Hydrocut Trail Condition Monitoring System
Waterloo Cycling Club


 
Latest Entries
 

1
comments
MTB

Trail Day This Saturday October 20th…

Posted  October 16, 2012  by  WCC Administrator

The Adam’s Run, Twister and Jessica trails are getting extended.  A lot of work on these sections has already been done, but we need a large crew to finish it all off. The more people we get, the sooner will these sections be opened. The Trail Day crew is meeting at the Snyder’s Parking Lot, […]

Full Story »

0
comments
MTB

Fun Day at Waterloo Cycling Club Trails September 23rd

Posted  September 20, 2012  by  WCC Administrator

It’s that time of year again! Come out and support the Hydrocut (Waterloo Cycling Club Trails) at the 3rd annual Trail Fun Day at the Glasgow Parking Lot on Sunday, September 23rd from 11 am to 3 pm. Once again our local bike shops are banding together for an afternoon of barbecue, draws, prizes, cool MTB gear, […]

Full Story »

0
comments
MTB

September 22 Trail Day Details – Take Pride in What You Ride!

Posted  September 17, 2012  by  WCC Administrator

There are awesome trail developments lined up for this Fall: September 22nd Details: We have a series of projects for making the Pines trail system longer, faster and more interesting. The only limitation is in the amount of available volunteer helpers. So don’t be a limitation and come to join the work crew at 8:30 […]

Full Story »

0
comments
MTB

The Bridge Embankment

Posted  September 13, 2012  by  WCC Administrator

Earlier in the Summer the connection between the Landfill and Petersburg portions of the trail system was changed form a single two-way trail to two much safer separate one-way paths. To do this we had to install a new bridge over the canal. This is a wonderful bridge, but it took an awful lot of work […]

Full Story »

0
comments
MTB

WCC Trails Wildlife

Posted  July 24, 2012  by  WCC Administrator

The WCC Trails are a very unique and precious nature oasis, less than a kilometer away from the latest city sprawl explosion. Thanks to being sheltered by the Landfill barrier, a great variety of beautiful old trees, ponds, swamps and meadows managed to survive and offer a home for a teaming wildlife. Since the animals […]

Full Story »

0
comments
MTB

Exciting Trail happenings of late…

Posted  July 3, 2012  by  WCC Administrator

On Canada Day the Frankenstein got a new exciting berm. With it the old persistent front-wheel-catching mud hole is gone; making the down swooping left turn much smoother/faster.  The water collecting problem is solved with a channel and a culvert. The full appreciation of the improvement will only be possible after some rain solidifies the […]

Full Story »

2
comments
MTB

Thank you volunteers!

Posted  June 25, 2012  by  WCC Administrator

One more impressive trail project got completed thanks to the dedicated volunteers. This vas a huge task that took countless hours of coming up with an way to squeeze a new trail in a very limited space, building and transporting an intricate bridges, and doing quite a bit of preparation work to make everything ready for the final crew. As […]

Full Story »