Hydrocut Trail Condition Monitoring System
Waterloo Cycling Club


 
Latest Entries
 

0
comments
MTB

Amazing Fall Trail Changes/Additions

Posted  October 24, 2012  by  WCC Administrator

Fall is trail building season, and this one is an exceptionally busy one. So far we’ve added a sweet extension to Creepy Corner, changed/improved Bootleg Trail, added a thrilling fast section to Adam’s Run, and made Twister much longer. The intersection – trail hub at the beginning of Kamikaze has improved and the connectivity of […]

Full Story »

0
comments
MTB

Latest Reported Trail Conditions…Please Respect Signs/Postings

Posted  October 22, 2012  by  WCC Administrator

The Hydrocut Trails are maintained exclusively by volunteer labour. Part of the trail maintenance work is guarding against the destructive activities. Riding in muddy conditions is awfully detrimental to the trail surface, so our dedicated volunteers take a great effort to prevent/stop this from happening. One of the prevention measures are the temporary trail closures […]

Full Story »

1
comments
MTB

Trail Day This Saturday October 20th…

Posted  October 16, 2012  by  WCC Administrator

The Adam’s Run, Twister and Jessica trails are getting extended.  A lot of work on these sections has already been done, but we need a large crew to finish it all off. The more people we get, the sooner will these sections be opened. The Trail Day crew is meeting at the Snyder’s Parking Lot, […]

Full Story »

0
comments
MTB

Fun Day at Waterloo Cycling Club Trails September 23rd

Posted  September 20, 2012  by  WCC Administrator

It’s that time of year again! Come out and support the Hydrocut (Waterloo Cycling Club Trails) at the 3rd annual Trail Fun Day at the Glasgow Parking Lot on Sunday, September 23rd from 11 am to 3 pm. Once again our local bike shops are banding together for an afternoon of barbecue, draws, prizes, cool MTB gear, […]

Full Story »

0
comments
MTB

September 22 Trail Day Details – Take Pride in What You Ride!

Posted  September 17, 2012  by  WCC Administrator

There are awesome trail developments lined up for this Fall: September 22nd Details: We have a series of projects for making the Pines trail system longer, faster and more interesting. The only limitation is in the amount of available volunteer helpers. So don’t be a limitation and come to join the work crew at 8:30 […]

Full Story »

0
comments
MTB

The Bridge Embankment

Posted  September 13, 2012  by  WCC Administrator

Earlier in the Summer the connection between the Landfill and Petersburg portions of the trail system was changed form a single two-way trail to two much safer separate one-way paths. To do this we had to install a new bridge over the canal. This is a wonderful bridge, but it took an awful lot of work […]

Full Story »

0
comments
MTB

WCC Trails Wildlife

Posted  July 24, 2012  by  WCC Administrator

The WCC Trails are a very unique and precious nature oasis, less than a kilometer away from the latest city sprawl explosion. Thanks to being sheltered by the Landfill barrier, a great variety of beautiful old trees, ponds, swamps and meadows managed to survive and offer a home for a teaming wildlife. Since the animals […]

Full Story »