Hydrocut Trail Condition Monitoring System
Waterloo Cycling Club


 
Latest Entries
 

1
comments
MTB

Trail Day – Saturday June 23rd

Posted  June 15, 2012  by  WCC Administrator

The Hydrocut’s cycling traffic is on a steady increase. This is very obvious from the numbers of cars in the parking lot and confirmed with the data from our trail counters. The one-way trail system is the only reason the trails still don’t feel too crowed. The few remaining two-way sections are on the list to […]

Full Story »

3
comments
MTB

New Bridges at the Hydrocut

Posted  June 11, 2012  by  WCC Administrator

Enjoy the new bridges that have been installed on the Double Bypass and Bride trails. The work crew spent the Sunday morning on the location. It was quite disappointing to see all the riders that came through riding the very muddy trails. We politely told each cyclist that riding in such conditions wrecks the trails […]

Full Story »

1
comments
MTB

Trail Counter Vandalism and Information

Posted  June 6, 2012  by  WCC Administrator

Our trail traffic counters fell victim to some vandalism. Fortunately the actual counters were spared.

Full Story »

0
comments
MTB

Complimentary support to all WCC Riders @ Hardwood Hills OCup c/o Alex Sanna – SRS Soigneur

Posted  May 31, 2012  by  WCC Administrator

Waterloo Cycling Club has retained the services of Alex Sanna of SRS Soigneur for  this Sunday’s OCup #3 at Hardwood Hills.  The WCC would like to extend this complimentary offer to all WCC Members participating in the event.  Riders will have the use of shelter/tents (WCC/SRS Soigneur), use of trainers to warm up and espresso.  Basically, […]

Full Story »

2
comments
MTB

New Entrance to Frankenstein!

Posted  May 21, 2012  by  WCC Administrator

A new entrance to the Frankenstein Trail has been created. The old two-way entrance/exit is only an EXIT now. The first picture shows the old entrance that’s changed in to an exit (see the Wrong Way sign). The entrance is just to the right of the rocks shown in the pictures. The second picture show […]

Full Story »

0
comments
MTB

Exciting New Facelift for Frankenstein Trail

Posted  May 17, 2012  by  WCC Administrator

The Frankenstein Trail is finally getting some attention! The annoying and persistent wet spots are being eliminated for good. While at it, we are using the opportunity to make the trail smoother, faster, and always a bit longer. Look for new culverts and burms; some already there and more to come. The burms are much […]

Full Story »

3
comments
MTB

Trail Blockage/Re-routing

Posted  April 18, 2012  by  WCC Administrator

More than a year ago The Region had closed a passage through an eroding gully that was used for shortcutting between sections of the Multi-Use (double-track) Trail. They’ve blocked the passage with big trees and have clearly posted their authority and the  reasons for the closure (the signs are visible on the pictures). However, people  have started making new shortcuts […]

Full Story »